Job PO # | SCS Job # | J-19-18554 | |
Contractor | NorPac Sheet Metal | ||
Sales Engineeer | Gary Wambeke | 406-451-7232 | Project Admin |
Updated | 07/15/2020 1:01 am |
Release | Shipping | Delivery | Freight Claims | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SCS PO# | MANUFACTURER | TAG | DESCRIPTION | # ORDERED | # DELIVERED | # B/O | STATUS | RELEASE | ORDERED | LEAD | NOTES | ESTIMATED | ACTUAL | TRACKING | NOTES | ESTIMATED | ACTUAL | SIGNED | NOTES | ISSUES | CLAIM # | NOTES |
PO-19-18554-01 | AQC Dust Collecting Systems | DUST COLLECTION SYSTEM THAT INCLUDES ABORT DAMPER, SPARK DETECTION SYSTEM, EXPLOSION VENT AND NO RETURN FLAME PREVENTION DAMPER FOR RE-CIRCULATION OF AIR BACK INTO BUILDING
AQC - Dust Collection System Unit, Model AMV-570.
-3000 CFM
-V Shaped Filters
-Reinforced support structure
-Access Doors to filters
-Inlet Plenum and Explosion Vent COMPLIANT WITH NFPA68 EXPLOSION REGULATION
-NFPA Explosion Relief Venting
-Hopper - DRUMS BY OTHERS
-Blower with VFD
-Shaker System & Control Panel NEMA4 with fused disconnect
-Spark Detection System - NEMA4 Control Panel, 2x Infrared Detectors, 1 spray assembly with solenoid valve and strainer, alarm siren and 16 hour battery backup.
-No Return Flame prevention Damper (NFPA69 COMPLIANT)
-Factory Startup
FIELD WIRING BY OTHERS
CURRENT LEAD TIME IS 8-9 WEEKS TO SHIP | 1 | 1 | 0 | DELIVERED | 07/01/2019 | 07/01/2019 | 8-10 weeks | 09/24/2019 | 09/26/2019 | OTHER NA | 10/15/2019 | 10/15/2019 | NA | |||||||
PO-19-18554-02 | Johnson Controls | BASIS OF DESIGN
2 – TAG: AHU-4 & AHU-6 – JCI Model AHD Horizontal Direct Drive Blower Coil Units
• 208/3 Phase ECM Motor – accepts remote 2-10vdc signal for motor control
• Drain Pan float Switch
• Drain Pan –
• Motor Handing –
• 2” 30% Pleated MERV 8 Filters with (1) Spare Set
• Hot Water Coil
• Fan Arrangement 3 – Horizontal – top Front
• External Spring Hangers
• Disconnect by others
• Controls by others
1 – TAG: AHU-Complex – JCI Model AVD Vertical Direct Drive Blower Coil Units
• 208/3 Phase ECM Motor – accepts remote 2-10vdc signal for motor control
• Drain Pan float Switch
• Drain Pan
• Motor Handing
• 2” 30% Pleated MERV 8 Filters with (1) Spare Set
• Hot Water Coil
• Fan Arrangement 2 – Upblast Front
UNITS DO NOT QUALIFY FOR EXPEDITED SHIPPING - CURRENT LEAD TIME IS 7-9 WEEKS TO SHIP
*Excludes all rigging, controls, damper actuators, VFDs and Startup*
| 3 | 3 | 0 | DELIVERED | 06/20/2019 | 06/20/2019 | 8-10 weeks | 08/12/2019 | 08/12/2019 | OTHER NA | 08/19/2019 | 08/19/2019 | NA | |||||||
PO-19-18554-03 | Thybar Corporation | Roof Curbs - AHU-1,2 JCI XTO | 2 | 2 | 0 | DELIVERED | 06/24/2019 | 06/24/2019 | 2-3 weeks | 07/09/2019 | 07/09/2019 | OTHER flatbed - B2B | 07/15/2019 | 07/15/2019 | NA | |||||||
PO-19-18554-04 | KE Fibertec | BASIS OF DESIGN
Runs of Fabric Ductwork, 36" Round.
-Inject XL Pattern
-Mounting Hardware
-Standard Color - to be selected from chart. | 2 | 2 | 0 | DELIVERED | 06/25/2019 | 06/25/2019 | 3-4 weeks | 07/18/2019 | 07/17/2019 | 07/24/2019 | 07/24/2019 | NA | ||||||||
PO-19-18554-05 | Nailor Industries | Duct Access Doors. | 2 | 2 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||
Low Leakage Control Damper - Opposed Blade.
-Channel Frame
-Side Mounting Plate
-Fail Close
*Actuator by Others* | 2 | 2 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||||
Manual Volume Damper with locking quadrant and 2" standoff. | 7 | 7 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||||
Supply Registers, 24" x 12" - 10" | 2 | 2 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||||
Low Leakage Control Damper - Opposed Blade.
-Channel Frame
-Side Mounting Plate
-Actuator
-Aux. Switch
-Fail Close | 1 | 1 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||||
Grilles, Registers, and Diffusers.
*Field confirm dimensions prior to release* | 2 | 2 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||||
Nailor Rush | 1 | 1 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/14/2019 | 08/14/2019 | XPO 972369823 | 08/21/2019 | 08/21/2019 | ||||||||||
PO-19-18554-06 | Acme Engineering | ACME Intake Gravity Vent, Model: IV 20x20. | 1 | 1 | 0 | DELIVERED | 07/29/2019 | 07/29/2019 | 2-3 weeks | 08/13/2019 | 08/21/2019 | YRC 7781139986 | 08/28/2019 | 08/28/2019 | NA | |||||||
PO-19-18554-07 | Schebler Company | Lot of Boiler Flue for (2) 8" Exhaust Systems.
-Model eVent with DualSeal System
-AL29-4C Stainless Steel Inner Shell
-430 Stainless Steel Outer Shell
-Flanged end of flue to include a pre-installed red gasket
-1" air space between inner and outer
-Rain Cap
-Double wall SS venting system for gas fired appliances listed as category II, III, IV.
-Estimated 25' to roof penetration, Field verify prior to releasing* | 1 | 1 | 0 | DELIVERED | 09/18/2019 | 09/18/2019 | 1-2 weeks | 09/26/2019 | 09/24/2019 | Estes 0650428310 | 09/30/2019 | 09/30/2019 | NA | |||||||
5 working Day Expedited Rush | 1 | 0 | 0 | DELIVERED | 09/18/2019 | 09/18/2019 | RUSH | 09/26/2019 | 09/24/2019 | Estes 0650428310 | 09/30/2019 | 09/30/2019 | NA | |||||||||
PO-19-18554-08 | AQC Dust Collecting Systems | Booster Pump, Model: BPS-9X4 System. | 1 | 1 | 0 | DELIVERED | 10/09/2019 | 10/09/2019 | 4-5 weeks | 11/01/2019 | 11/01/2019 | OTHER NA | 11/08/2019 | 11/08/2019 | ||||||||
PO-19-18554-09 | Nailor Industries | Supply Grille, Dust Collector. | 1 | 1 | 0 | DELIVERED | 12/09/2019 | 12/09/2019 | 1-2 weeks | 12/18/2019 | 12/18/2019 | FedEx 147792189580 | 12/24/2019 | 12/24/2019 | NA | |||||||
PO-19-18554-10 | S. Conley Sales | Balance/Startup of Project. | 1 | 1 | 0 | DELIVERED | 12/16/2019 | 12/16/2019 | NA |