MSU Romney Hall Reno WET SIDE
(Closed)

Job PO #10101/W-00001SCS Job #J-19-28073
Sales EngineeerJosh Huffman406-585-7333
Project ManagerZ - Liz Pullman406-551-7221
Updated04/21/2023 10:04 am
POShippingDelivery
SCS PO#MANUFACTURERTAGDESCRIPTIONORDSHIPDELVB/OSTATUSORIGINAL
ESTIMATED
SHIP DATE
REVISED
ESTIMATED
SHIP DATE
ACTUAL
SHIP DATE
TRACKINGNOTESESTIMATED
DELIVERY
DATE
ACTUAL
DELIVERY
DATE
SIGNEDNOTES
19-28073-01
Kirst Process Equipment
ST-1A, ST-1B, ST-2, ST-3
Armstrong steam traps
4
4
4
0
DELIVERED
10/09/2020
11/03/2020
11/03/2020
11/09/2020
11/09/2020
BM
CRP-1
Armstrong Duplex style condensate return system
1
1
1
0
DELIVERED
19-28073-02
Mason Industries
Lot of Seismic Restraints and Overturn Calculations for Mechanical Piping and Plumbing Piping
1
1
1
0
DELIVERED
08/28/2020
08/24/2020
08/28/2020
08/28/2020
Swank
19-28073-03
Jaga Canada
FT's
Wall Mounted Strada
71
71
71
0
DELIVERED
10/26/2020
10/26/2020
OTHER 51198 Omnispheres
12/04/2020
12/03/2020
19-28073-04
Keller Supply
Rad's
Slenderized Radiators
10
10
10
0
DELIVERED
10/09/2020
10/12/2020
BEST WAY LTL Carrier
10/19/2020
10/20/2020
19-28073-05
Armstrong Pumps
Series 4380 Close Coupled VIL Pump
2
2
2
0
DELIVERED
10/26/2020
10/30/2020
BEST WAY 20779734 CMF
11/06/2020
11/05/2020
Paul
Series 4030 End Suction Base Mounted Pump
2
2
2
0
DELIVERED
11/13/2020
11/10/2020
UPS FREIGHT 894198126
11/23/2020
11/18/2020
James
Compass H Circulator ECM Motor
2
2
2
0
DELIVERED
11/13/2020
11/06/2020
11/12/2020
11/12/2020
Swank trailer
19-28073-06
Sigma Products
HUH-1, HUH-2, HUH-3, HUH-4
040H Horizontal Unit Heater
4
4
4
0
DELIVERED
10/19/2020
11/02/2020
UPS FREIGHT 497663784
11/12/2020
11/13/2020
gate
CUH-1, CUH-2, CUH-3, CUH-4
SLPSFF-06 Slope Top Inverted Floor Mounted Cabinet Unit Heater
4
4
4
0
DELIVERED
CUH-5
SFF-06 Fully Recessed Ceiling Mounted Cabinet Unit Heater
1
0
0
0
DELIVERED
19-28073-07
SPIROTHERM
AS-1, AS-2
Air & Dirt Separator
2
2
2
0
DELIVERED
09/24/2020
09/24/2020
BEST WAY 512863884 R&L Carriers
10/01/2020
10/01/2020
19-28073-08
Armstrong Pumps
ET-1, ET-2
1600-L Bladder Type 422 Gallon Capacity
2
2
2
0
DELIVERED
11/06/2020
10/19/2020
10/22/2020
BEST WAY
10/29/2020
11/02/2020
ET-3
A600-L Bladder Type 158 Gallon Capacity
1
1
1
0
DELIVERED
ET-4
A300-L Bladder Type 80 Gallon Capacity
1
1
1
0
DELIVERED
19-28073-09
Armstrong Pumps
P-5, P-6
Series 4380 Close Coupled VIL Pump
2
0
0
0
DELIVERED
11/20/2020
11/06/2020
OTHER 20779699 CMF
11/12/2020
11/16/2020
Dave
Armstrong Tag: HX-1 Shell & Tube Heat Exchanger WS-1003-400 Length = 3ft 4 Pass 10" Diameter
1
1
1
0
DELIVERED
10/16/2020
10/19/2020
BEST WAY 20779650 CMF
10/26/2020
10/29/2020
Paul
19-28073-10
Mason Industries
Hydronic Piping
18
18
18
0
DELIVERED
10/16/2020
10/05/2020
10/09/2020
10/09/2020
Swank Trailer
19-28073-11
Nexus Valve
Nexus Valve Tags: FT-1(Qty:21), R-199, R-299, R-399, AHU-007, AHU-008, VAU-1, RHP-1, RHP-2, CU-1(Qty:2), CU-VAU A2Y Coil Packs Includes automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. Union with PT port and manual air vent. Tag: AHU-306 A2FY Coil Packs Includes cast iron automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. Tags: HP's(Qty:50) AYH Hose Packs Includes automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. 24" stainless steel braided hoses with EPDM core and hose adapters. Tags: HUH's(Qty:4), CUH's(Qty:5) O2Y Coil Packs Includes manual flow valve with memory stop, shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. Union with PT port and manual air vent. Tags: P-3, P-4 NVFB Cast iron venturi circuit setter with memory stop, shut off, PT ports, and hang tag. Tag: AS-1 SXFV Cast Iron Y-strainer with blowdown valve, shut off, and PT ports. Tags: FT's(Qty:71), RAD's(Qty:12) XB Manual flow control valve with memory stop, shut off, PT ports, and hang tag.
181
181
181
0
DELIVERED
11/04/2020
10/27/2020
RMA 3342 GOODWILL - item # 10 UM-150LS-XXX-12.0 (1)
11/02/2020
11/02/2020
Brad
CREDIT CM-0004523
0
0
0
0
ORDERED
19-28073-12
VJ Stanley
PRV-1, PRV-2
E-C1E9A1 1" E Valve Body Full Port
2
2
2
0
DELIVERED
10/30/2020
11/09/2020
SAIA
11/16/2020
11/16/2020
19-28073-13
Keller Supply
CP-1
UPS 32-160 Domestic Circulator
1
1
1
0
DELIVERED
12/09/2020
12/14/2020
UPS
12/21/2020
12/23/2020
19-28073-14
Mason Industries
SEISMIC RELEASE FOR EQUIPMENT ONLY
1
0
0
0
DELIVERED
01/15/2021
01/13/2021
01/21/2021
01/14/2021
swank
19-28073-15
Mason Industries
HUH-1,2,3,4, CUH-5
CPSB 1" x 12
10
10
10
0
DELIVERED
10/30/2020
10/27/2020
11/02/2020
11/02/2020
Swank
19-28073-16
Nexus Valve
CRP-1
XB
1
0
0
0
SHIPPED
12/03/2020
11/17/2020
11/20/2020
11/20/2020
Swank
19-28073-17
Armstrong Pumps
3/4" CBV
1
0
0
0
DELIVERED
01/19/2021
01/19/2021
Sch delivery 1.22.2021 by 9pm
01/22/2021
01/25/2021
Front Door
19-28073-18
Nexus Valve
1.25" Union
1
1
1
0
DELIVERED
01/21/2021
01/21/2021
01/28/2021
01/25/2021
front door
19-28073-19
Kirst Process Equipment
Shipping costs
1
0
0
0
ORDERED
19-28073-20
Nexus Valve
HNA
8
8
8
0
DELIVERED
02/02/2021
02/03/2021
02/05/2021
02/05/2021
Front Door
19-28073-21
Mason Industries
(8) RW30N-X-33 springs
8
8
8
0
DELIVERED
03/19/2021
03/05/2021
03/11/2021
03/11/2021
AUSTIN
19-28073-22
Nexus Valve
2 - 3/4” hoses 2 - 3/4” to 1/2 adapters 1 - manual balancing valve 1 gpm for R-2
5
5
5
0
DELIVERED
03/15/2021
03/15/2021
03/15/2021
03/18/2021
03/18/2021
signature on file
19-28073-23
Nexus Valve
1 – 1-1/2 hose and adapter
14
14
14
0
DELIVERED
03/30/2021
03/30/2021
04/02/2021
04/02/2021
swank trailer
19-28073-24
Nexus Valve
Nexus RMA# 3342
1
1
1
0
DELIVERED
04/07/2021
04/06/2021
04/09/2021
04/09/2021
swank trailer
19-28073-25
Jaga Canada
Jaga Tag: FT-306.8 Strada Unit STRW.06509010 Opposite End Connections
1
1
1
0
DELIVERED
05/10/2021
05/10/2021
05/14/2021
05/17/2021
Ray
19-28073-26
S. Conley Support
S. Conley Support Sales Order 21-61050 Checked both PRV's for leaks on heat exchanger per manufacturers orders. Both PRV's held and do not need replaced.
1
0
0
0
ORDERED
19-28073-27
S. Conley Support
Startup for the following: Qty: 2 - Armstrong 4030 Pumps Qty: 1 - Armstrong International Condensate Pumps
1
0
0
0
SHIPPED
06/14/2021
06/14/2021
19-28073-28
Nexus Valve
(2) - 1" Hoses (2) - 1" x 1/2" Adapters
4
4
4
0
DELIVERED
05/18/2021
05/18/2021
5.18 UPS> no tracking avail yet
05/21/2021
05/21/2021
AUSTIN
19-28073-29
Jaga Canada
Filler Trim
1
1
1
0
DELIVERED
06/23/2021
06/23/2021
06/25/2021
06/25/2021
SWANK
19-28073-30
Keller Supply
Section of Burnham Radiator Replacement
1
1
1
0
DELIVERED
08/10/2021
08/10/2021
will call
08/10/2021
08/10/2021
19-28073-31
Apollo Mechanical Contractors
Labor and Materials for Apollo to add extra piping on Jaga radiant panels due to the 3 extra connections on all heat exchangers. Proposal Number: SC-001
1
0
0
0
ORDERED
19-28073-32
S. Conley Support
Labor for Shad to find that the Condensate Pump has wrong voltage ran to the unit
1
0
0
0
ORDERED
19-28073-33
S. Conley Support
SO 22-61781 Service work on condensate pump on 5/17/22
1
0
0
0
ORDERED
19-28073-34
S. Conley Support
SO 23-62357 GFP-2 is leaking
1
0
0
0
ORDERED