MSU Romney Hall Renovation
(Closed)

Job PO #SCS Job #J-20-18502
Sales EngineeerZ - Norm Comfort406-451-7230
Project ManagerGenava Handschke
Updated11/30/2023 10:50 pm
POShippingDelivery
SCS PO#MANUFACTURERTAGDESCRIPTIONORDSHIPDELVB/OSTATUSORIGINAL
ESTIMATED
SHIP DATE
REVISED
ESTIMATED
SHIP DATE
ACTUAL
SHIP DATE
TRACKINGNOTESESTIMATED
DELIVERY
DATE
ACTUAL
DELIVERY
DATE
SIGNEDNOTES
20-18502-01
Perry Fiberglass Products
Underground Ductwork on M100 for MSU Romney Hall Renovation. Note there are 2 runs of ductwork supply and return, see M301 for isometric view
1
0
0
0
ORDERED
05/19/2020
05/21/2020
05/21/2020
05/21/2020
05/21/2020
20-18502-02
Johnson Controls
VAU-1
JCI Ventilation Air Unit
1
1
1
0
DELIVERED
08/12/2020
08/21/2020
BEST WAY NA
08/28/2020
08/28/2020
20-18502-03
Renew Aire
Energy Recovery Ventilator, RenewAire Model: LE6XINV -Energy Recovery Core -Factory Mounted VFDs Tag: ERV-1
1
1
1
0
DELIVERED
07/24/2020
08/05/2020
BEST WAY NA - Hayes Transport
08/14/2020
08/14/2020
20-18502-04
IAC
Supply and Return Sound Attenuators. Tags: SA-01-05
32
32
32
0
DELIVERED
06/29/2020
07/01/2020
BEST WAY NA
07/07/2020
07/07/2020
NA
20-18502-05
Nailor Industries
Combination Fire/Smoke Damper Type A w/Sleeve. -165°F Closure Temp -120V Actuator -Duct Smoke Detector -Position Indicator -Retaining Angles
23
23
23
0
DELIVERED
07/03/2020
06/30/2020
2 items noted damaged
07/08/2020
07/08/2020
Paul G
Single Duct Terminal Units, NO HWC. -Fiber Free Liner -Diamond Flow Station/Sensor Tags: V-
16
16
16
0
DELIVERED
20-18502-06
Mason Industries
Seismic
1
1
1
0
DELIVERED
08/28/2020
08/21/2020
08/27/2020
08/27/2020
front door
20-18502-07
Water Furnace
HP-XXX
Heat Pumps, Vertical, Horizontal, and Console
50
50
50
0
DELIVERED
08/25/2020
08/31/2020
08/31/2020
BEST WAY 625154342 Landstar
09/08/2020
09/08/2020
Paul
20-18502-08
Bosch Thermotechonology Corp. (FHP)
AHU-007,008,306
Heat Pumps Water - Air Vertical
3
3
3
0
DELIVERED
10/09/2020
10/19/2020
10/19/2020
10/22/2020
10/22/2020
Swank
20-18502-09
IAC
2
2
2
0
DELIVERED
08/11/2020
08/11/2020
OTHER 575-6326863 Reddaway
08/13/2020
08/13/2020
20-18502-10
Acme Engineering
RF-1
Prop Wall/Box Relief Fan
1
1
1
0
DELIVERED
10/20/2020
10/20/2020
11/05/2020
11/05/2020
Paul G
20-18502-11
Nailor Industries
Duct Access Doors.
35
35
35
0
DELIVERED
09/01/2020
08/31/2020
BEST WAY 00262066680 SW Motor Transport
09/10/2020
09/10/2020
Aluminum Louver Drainable Blade High Performance. -Channel Frame -Aluminum Bird Screen -Powder Coated color to be selected by Architect Tags: L-1-5
5
5
5
0
DELIVERED
20-18502-12
Mason Industries
1 Lot of Seismic Isolation
1
1
1
0
DELIVERED
12/11/2020
12/03/2020
12/09/2020
12/10/2020
Roath
20-18502-13
Nailor Industries
Motorized Control Dampers.
14
14
14
0
DELIVERED
10/30/2020
10/29/2020
11/12/2020
11/10/2020
20-18502-14
LG ELECTRONICS, USA
CU-VAU
LG 12 Ton Water Source Heat Pump Module
1
1
1
1
DELIVERED
03/01/2021
03/01/2021
03/11/2021
03/11/2021
Paul G
CU-1, FC-XX
LG Variable Refrigerant System
1
1
1
0
DELIVERED
20-18502-15
Flexmaster
Boxes Insulated Flex Duct
9
9
9
0
DELIVERED
02/08/2021
01/27/2021
02/05/2021
02/09/2021
Norm Comfont
20-18502-16
Flexmaster
Boxes Insulated Flex Duct
37
37
37
0
DELIVERED
03/08/2021
03/08/2021
BEST WAY OCG (from invoice)
03/15/2021
03/23/2021
WARD CHUTL ?
20-18502-17
Nailor Industries
Grilles, Registers, and Diffusers.
316
316
316
0
DELIVERED
04/02/2021
04/02/2021
04/01/2021
04/07/2021
04/07/2021
PAUL
20-18502-18
Bosch Thermotechonology Corp. (FHP)
Qty. (3) - 8733951038 Zone Sensor R1 Qty. (3 - 8733927495 Humidity/Temperature Duct Sensor
6
6
6
0
DELIVERED
03/03/2021
03/03/2021
03/08/2021
03/08/2021
Handschke
20-18502-19
Nailor Industries
Model 6145H - 20" wide x 12" Tall neck size
1
1
1
0
DELIVERED
03/11/2021
03/10/2021
03/12/2021
03/12/2021
HANDSCHKE
20-18502-20
Nailor Industries
Damper Test Switches - FSDs.
23
23
23
0
DELIVERED
04/09/2021
03/26/2021
04/05/2021
04/01/2021
Missing Control Dampers.
5
5
5
0
DELIVERED
20-18502-21
Nailor Industries
S-11,12
S-11,12 GRDs Release
1
1
1
0
DELIVERED
04/22/2021
04/21/2021
05/11/2021
05/10/2021
PAUL
20-18502-22
Crescent Electric
Disconnect for HP-315, Model: DU322 SQD
1
1
1
0
DELIVERED
04/08/2021
04/08/2021
04/08/2021
04/08/2021
20-18502-23
Nailor Industries
8" x 8" Duct Access Doors.
3
3
3
0
DELIVERED
04/14/2021
04/14/2021
04/19/2021
04/19/2021
signature on file
20-18502-24
Nailor Industries
Replacement FSD w/Vertical Blade Mounting Option.
2
2
2
0
DELIVERED
04/21/2021
04/21/2021
04/26/2021
04/28/2021
Paul M
20-18502-25
Nailor Industries
Square to Round - GRDs.
54
54
54
0
DELIVERED
04/21/2021
04/22/2021
04/27/2021
04/26/2021
Paul G
20-18502-26
Electro Controls
AHUs Economizer Wiring and Controls.
1
0
0
0
ORDERED
20-18502-27
Nailor Industries
GRD Change order w/OBDs
11
11
11
0
DELIVERED
05/07/2021
05/07/2021
05/12/2021
05/11/2021
FFOSTER
20-18502-28
Nailor Industries
Extra Motorized Damper
1
1
1
0
DELIVERED
06/03/2021
06/03/2021
06/07/2021
06/07/2021
Singature on file
20-18502-29
LG ELECTRONICS, USA
EEV Kit - Part # PRLK096A0
1
1
1
0
DELIVERED
09/07/2021
09/01/2021
09/09/2021
09/10/2021
SCONLEY
20-18502-30
Water Furnace
Replacement Heat Pumps 101-1, 102-2
2
2
2
0
DELIVERED
10/04/2021
09/24/2021
10/04/2021
10/04/2021
F L signed on 10/4/2021 01:48 PM
20-18502-31
Bosch Thermotechonology Corp. (FHP)
The refrigerant circuit extended warranty cost is below: EC360 Part# 7738003555 $780 each Qty 1 EC181 Part# 7738003554 $502 each Qty 2
1
0
0
0
DELIVERED
07/13/2021
07/13/2021
OTHER BOSCH warranty
07/15/2021
07/15/2021
20-18502-32
Water Furnace
61P723-41S, Evap Coil
1
1
1
0
DELIVERED
08/05/2021
08/05/2021
08/05/2021
08/09/2021
08/09/2021
CD Handschke
61P706-41S, Evap Coil
1
1
1
0
DELIVERED
20-18502-33
Keller Supply
316587, 75va Transformer
1
1
1
0
DELIVERED
08/18/2021
08/18/2021
08/18/2021
08/18/2021
20-18502-34
Nailor Industries
Part number B2-676 165 DEGREE LIMIT SWITCH (ERL)
1
1
1
0
DELIVERED
09/03/2021
08/30/2021
09/02/2021
09/02/2021
CDHANDSHKE
20-18502-35
Nailor Industries
Nailor- FSD Duct Smoke Detector.
1
1
1
0
DELIVERED
09/10/2021
09/09/2021
09/15/2021
09/15/2021
CDHANDSHKE
20-18502-36
LG ELECTRONICS, USA
LG AHU Comm Kit- Replacement for suspected damaged controller.
1
1
1
0
DELIVERED
09/27/2021
09/24/2021
09/30/2021
09/29/2021
SCONLEY
20-18502-37
Koch Filter Corporation
Lot Stock Filters - ALL Heat Pumps.
1
1
1
0
DELIVERED
10/26/2021
10/27/2021
11/01/2021
11/01/2021
J KERNS
20-18502-38
Water Furnace
ZS2P-WFI02 Pro Zone Sensor with LCD, no options
5
5
5
0
DELIVERED
10/28/2021
10/28/2021
11/03/2021
11/02/2021
Signature on File
20-18502-39
LG ELECTRONICS, USA
LG - Motor Assembly Part# 4681A20172Z
1
0
0
0
SHIPPED
10/05/2021
10/05/2021
10/05/2021
10/05/2021
20-18502-40
Acme Engineering
ACME Parts - EF -Sheave AK154H -Belt -Sheave 1VP44
1
0
0
0
SHIPPED
08/26/2021
08/26/2021
08/26/2021
08/26/2021
20-18502-41
Koch Filter Corporation
Lot ATTIC Stock Filters - ALL Heat Pumps.
1
1
1
0
DELIVERED
12/01/2021
12/02/2021
OTHER 742-806175-4 USF REDDAWAY
12/06/2021
12/10/2021
Signed By: Jay
20-18502-42
S. Conley Support
Startup - MSU Romney Heat Pumps - John Clark
1
0
0
0
SHIPPED
08/05/2021
08/05/2021
08/05/2021
08/05/2021
20-18502-43
S. Conley Support
Startup - MSU Romney Heat Pumps - Dan Polen
1
0
0
0
ORDERED
20-18502-44
S. Conley Support
Startup - MSU Romney Heat Pumps - Shad Waldo
1
0
0
0
SHIPPED
08/31/2021
08/31/2021
08/31/2021
08/31/2021
20-18502-45
S. Conley Support
Service Work - Damaged Heat Pump Evaporators. 8-3, 8-4, 8-10 Labor to repair and replace evap coils tagged HP 199CO, HP 136H and HP 413
1
0
0
0
SHIPPED
11/04/2021
11/04/2021
11/04/2021
11/04/2021
20-18502-46
S. Conley Support
Service Work - Replace Pulley and Laser Align Belt on Prop Fan
1
0
0
0
ORDERED
20-18502-47
S. Conley Support
Service Work - LG Fan Coil Motor replacement. -LG trouble shooting/service work on VAU System.
1
0
0
0
ORDERED
20-18502-48
Water Furnace
ZS2P-WFI02 Pro Zone Sensor with LCD, no options
4
4
4
0
DELIVERED
01/07/2022
01/06/2022
01/10/2022
01/10/2022
Signature on File
20-18502-49
S. Conley Support
11/4/21 Labor - SC Sales: Shad Waldo Labor to work on HP10202 (no control wiring done) and HP101-2(no control wiring done); replaced fan motor on LG unit on 4th floor 12/16/21 Labor - SC Sales: Shad Waldo HP 101-1 an 102-2: Was given wrong address; the dipswitch #4 was in the middle instead of in the on position; made sure the address was correct on that unit AHU-008: power was shut off checked unit thoroughly and it seems like economizer is pulling in way too much air; will talk to Electro Controls HP-315: Need to figure out what is going on with controls; condensate pump is plumbed wrong 12/17/21 Labor - SC Sales: Shad Waldo All of the downstairs air handlers are in full economizer mode; room 8 was at 42 degrees and delivery air temp was 20 degrees; room 7 was at 47 degrees and the delivery air temp was 22 degrees. the room on floor 3 that gets served by air handler has hot water heater too, so it was not cold but it was in full economizer too. HP-136C: disconnect was in off position
1
0
0
0
SHIPPED
01/28/2022
01/28/2022
01/28/2022
01/28/2022
20-18502-50
S. Conley Support
1/12/22 - Labor - HP-315; turn power back on after condensate was fixed, adjusted belt and pulley, everything is working. HP-201: water issue and airlfow issue. HP-102-2; has E6 error and will need a new low pressure sensor. Labor - SC Sales: Shad Waldo
1
0
0
0
ORDERED
20-18502-51
S. Conley Support
Service Work Per Sales Order 22-61685
1
0
0
0
ORDERED
20-18502-52
S. Conley Support
7/12/2022 Romney Hall Florida Heat Pumps condensing water valves needed to be set up to open when a call for compressor was given and needed several parameters checked and changed to allow this. Also checked parameters on LG system for Jamie and swapped a few setpoints. Labor - SC Sales: Tanner Jarrett
1
0
0
0
ORDERED
20-18502-53
S. Conley Support
Arrived onsite, recovered system to verify charge. Pulled 21 lbs, on point with the LATS that Jamie sent from when system was installed. Put charge back in and ran tested, ended up adding an additional 11 lbs of charge to get the system to operate within specs. System maintaining DAT setpoint on VAU, packed up and checked out. 1-4-23 Unit still not operating, checked unit. Found system still low, added 9 more lbs R410A, unit operating normally now. Not hunting with compressors and EEV's, will keep an eye on it and verify.
1
0
0
0
DELIVERED
20-18502-54
S. Conley Support
UPM Control Board 1-13-23 Checked in with Neil, got access to mech room. Installed new UPM board AHU 008, verified operation.
1
0
0
0
DELIVERED
20-18502-55
S. Conley Support
10/21/2022 Service call on LG Unit CU-VAU at MSU Romney Hall Basement for comm errors. Fixed comm error with a hard shut down of odu and eev controller on air handler. As soon as the unit came back online it started ramping the compressor very strange and getting extremely high discharge pressures. Ended up pulling the main EEV and determining it was bad. Jay is ordering a new main EEV.Labor - SC Sales: Tanner Jarrett 11/1/2022 CU-VAU installed main eev valve and tried to run unit again with the same issues as last time.Tried resetting the unit and talked to Jamie and LGMVP. LGMVP wanted a recording for 30 minutes so i sent that to them but they never got back to me.Labor - SC Sales: Tanner Jarrett 11/2/2022 CU-VAU got Travis to send commands to unit and reset power 3 times but units would not run. Put unit in VACC mode and checked all EEV positions to see if they were open. Learned from Jamie that this unit will not run through LGMV tool so i was basically chasing my tail on other problems but the main problem is that the unit simply wont run when it has a call.Labor - SC Sales: Tanner Jarrett 11/17/2022 Went to MSU CU-VAU unit has call but still will not run don't know what to do LGMVP doesn't know anything either.Labor - SC Sales: Tanner Jarrett 11/18/2022 Went to MSU CU-VAU with Jamie we reset all EEVs with the tool I ended up leaving at 2:00 for site Z. Jamie got unit reprogrammed for LGMV and ran it to ensure it will work. Then reprogrammed it for bacnet control and somehow he got it to run at about 4 ish. Labor - SC Sales: Tanner Jarrett
1
0
0
0
DELIVERED
20-18502-56
Nailor Industries
Replacement GRDs- R-7
2
2
0
0
DELIVERED
03/17/2023
03/07/2023
03/10/2023
03/10/2023
20-18502-57
ABB
ABB NEMA Kits for moving ERV Drives MUL1-R1
2
2
2
0
DELIVERED
03/01/2023
03/01/2023
03/06/2023
03/07/2023
DDAN
20-18502-58
S. Conley Support
Labor to move VFDs on ERV to exterior of cabinet.
1
0
0
0
ORDERED