Missoula International Airport WET SIDE
(Closed)

Job PO #20-600-22SCS Job #J-19-14062
Sales EngineeerJosh Huffman406-585-7333
Project ManagerZ - Liz Pullman406-551-7221
Updated11/28/2023 9:14 pm
POShippingDelivery
SCS PO#MANUFACTURERTAGDESCRIPTIONORDSHIPDELVB/OSTATUSORIGINAL
ESTIMATED
SHIP DATE
REVISED
ESTIMATED
SHIP DATE
ACTUAL
SHIP DATE
TRACKINGNOTESESTIMATED
DELIVERY
DATE
ACTUAL
DELIVERY
DATE
SIGNEDNOTES
19-14062-01
RIELLO
Array AR4000
4
0
0
0
DELIVERED
08/01/2020
07/27/2020
07/27/2020
BEST WAY NA
07/31/2020
07/31/2020
Array AR3000
1
0
0
0
ORDERED
Condensate Neutralizer Kits
4
0
0
0
ORDERED
Condensate Neutralizer Kit
1
0
0
0
ORDERED
BACnet Gateway (RS485)
2
0
0
0
ORDERED
Freight to Zip Code 59808
1
0
0
0
ORDERED
19-14062-02
Mason Industries
Lot of Seismic Restraints and Vibration Controls
1
1
1
0
DELIVERED
02/12/2021
02/18/2021
02/23/2021
02/24/2021
n/a
19-14062-03
Armstrong Pumps
HX-1, HX-2
Plate and Frame Heat Exchangers
2
2
2
0
DELIVERED
09/18/2020
09/15/2020
BEST WAY 20780107 CMF
09/22/2020
09/23/2020
JOE MOHLER
19-14062-04
Jaga Canada
LUH-1, LUH-2
Clima Canal Linear Unit Heaters
4
0
0
0
DELIVERED
09/21/2020
09/21/2020
BEST WAY Ocean freight
10/26/2020
10/28/2020
19-14062-05
Sigma Products
CUH-4, CUH-5, CUH-6, CUH-7
Wall Mounted Cabinet Unit Heaters
10
0
0
0
DELIVERED
10/02/2020
11/09/2020
11/19/2020
11/18/2020
J MOHLER
UH-1-5
Horizontal Hydronic Unit Heaters
0
0
0
0
DELIVERED
19-14062-06
Hubbell Water Heaters
DWH-1, DWH-2, DWH-3
Gas Fired Water Heaters
3
3
3
0
DELIVERED
01/05/2021
01/26/2021
02/18/2021
02/18/2021
Joe
19-14062-07
Armstrong Pumps
DET-1, DET-2
AST Series Diaphragm Type Expansion Tanks
2
2
2
0
DELIVERED
11/11/2020
11/11/2020
BEST WAY cmf 20779833
11/18/2020
11/17/2020
Joe M
19-14062-08
Keller Supply
SP-1, SP-2
Liberty ELV290 Elevator Sump Pumps
2
2
2
0
DELIVERED
10/21/2020
10/21/2020
BEST WAY
10/28/2020
10/28/2020
19-14062-09
SPIROTHERM
AS-1, AS-3, AS-2
VDN Air and Dirt Separators and VHN High Velocity Air and Dirt Separator
3
3
3
0
DELIVERED
11/16/2020
11/13/2020
BEST WAY 032573682 R&L
11/20/2020
11/20/2020
19-14062-10
Armstrong Pumps
ET-1, ET-2, ET-3
A Series Bladder Type Expansion Tanks
3
3
3
0
DELIVERED
10/30/2020
10/27/2020
11/04/2020
11/04/2020
19-14062-11
Lakos
CS-1, CS-2
Centrifugal Separators
2
2
2
0
DELIVERED
12/18/2020
12/18/2020
12/30/2020
12/29/2020
Kevin T
19-14062-12
Twin City Hose
Twin City Hose Pipe and Pipe Fittings
18
18
18
0
DELIVERED
10/30/2020
10/26/2020
FED-EX FREIGHT 527838985-2
11/04/2020
11/02/2020
Ted C
19-14062-13
MultiAqua, Inc.
FC-1, FC-2, FC-12
Cased Chilled Water and Hot Water Fan Coils
3
3
3
0
DELIVERED
10/21/2020
10/21/2020
10/30/2020
10/29/2020
Joe
CVMINI Condensate Pumps
10
10
10
0
DELIVERED
FC's
MHWW Hi-Wall Heat/Cool Water Fan Coils w/ Remote Control
10
10
10
0
DELIVERED
19-14062-14
Keller Supply
CWP's & HWP's
Series LCS Base Mounted End Suction Pumps VFD Ready Motor Suction Guides Included 460/3/60
7
7
7
0
DELIVERED
11/20/2020
11/24/2020
11/24/2020
BEST WAY Na
12/02/2020
12/02/2020
19-14062-15
Mason Industries
Seismic Restraints and Vibration Controls
1
1
1
0
DELIVERED
03/05/2021
02/27/2021
03/05/2021
03/05/2021
DAVIS
3.10 Josh H. SCS to Terry GCP&H "Mason Industries received notice from UPS that one box, from PO# PO-19-14062-15 MI# 682179, was damaged. 7 out of 8 packages were delivered on March 4th and March 5th. Can you please see if you are missing anything from this order? If you are we will get replacements sent out."
19-14062-16
Nexus Valve
Nexus flow control
160
0
0
0
DELIVERED
01/22/2021
12/22/2020
12/08/2020
BEST WAY 07258714- R&L
12/22/2020
12/22/2020
LMuler
19-14062-17
Nortek Global Hvac
GUH-1,2,3
Reznor Gas Fired Unit Heaters
3
0
0
0
DELIVERED
12/21/2020
12/23/2020
12/23/2020
OTHER 1080435607 Averitt Express
01/08/2021
01/07/2021
Mohler
19-14062-18
Roberts Gordon
RTH-1,2,3,4
Gas Fired Infrared Tube Heaters
4
4
4
0
DELIVERED
12/22/2020
12/28/2020
12/31/2020
01/04/2021
19-14062-19
STULZ Air Technology Systems, Inc.
HUM-1
DRH-08 Wall Mounted Ultrasonic Humidifier
1
1
1
0
DELIVERED
03/18/2021
03/19/2021
OTHER 4VEHHNEN4BKEY CH Robinson
03/25/2021
03/25/2021
C MOHLER
19-14062-20
Sigma Products
RCP1-2
Radiant Ceiling Panels
6
0
0
0
DELIVERED
01/21/2021
01/11/2021
DELIVERY DATE: 01/21/2021 - Signed By: Mohler
01/20/2021
01/21/2021
19-14062-21
Johnson Controls
FC-13, FC-14, FC-15, FC-16
Johnson Controls 2 Pipe Fan Coil
4
4
4
0
DELIVERED
02/08/2021
01/29/2021
OTHER
shipped and invoiced in full, per Amanda 2.19
02/05/2021
02/19/2021
na
19-14062-22
Keller Supply
SMP'
MAGNA3 50-150 ECM Motor Flange Kits
4
0
0
0
DELIVERED
01/19/2021
01/19/2021
UPS NA
01/28/2021
01/18/2021
Davis
19-14062-23
Armstrong Pumps
RCP-1
Circuit Balancing Valve
1
1
1
0
DELIVERED
02/02/2021
02/04/2021
02/09/2021
02/09/2021
Mohler
19-14062-24
Nexus Valve
DHWR's, RCP-2 MBNL
17
17
17
0
DELIVERED
01/29/2021
01/29/2021
02/04/2021
02/04/2021
Mohler
19-14062-25
Twin City Hose
Pipe Guide
16
16
16
0
DELIVERED
03/11/2021
03/11/2021
FED-EX 8962484823
03/15/2021
03/15/2021
mohler
19-14062-26
Keller Supply
RCP-1, RCP-2
UPS Stainless Steel Circulators (For Potable Water)
2
2
2
0
DELIVERED
03/06/2021
03/01/2021
BEST WAY NA
03/06/2021
02/24/2021
DAVIS
19-14062-27
RIELLO
Boiler Corner Feet
20
20
20
0
DELIVERED
04/16/2021
04/20/2021
04/20/2021
6.23 inquired w Hilda/Riello
04/26/2021
04/26/2021
PORTER
Boiler Center Feet
10
10
10
0
DELIVERED
Bolts Vite CZ.5
6
6
6
0
DELIVERED
19-14062-28
Mason Industries
250' Spool of 1/8" cable
1
1
1
0
DELIVERED
05/07/2021
04/26/2021
05/03/2021
05/03/2021
DAVIS
19-14062-29
Nexus Valve
(3) 3/4" MBNL Valves
3
3
3
0
DELIVERED
06/09/2021
06/04/2021
06/10/2021
06/10/2021
bruner
19-14062-30
Nexus Valve
VAV-218
Nexus Valve Tag: VAV-218 A2Y Coil Packs Includes automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. Union with PT port and manual air vent.
1
1
1
0
DELIVERED
06/21/2021
06/08/2021
06/14/2021
06/14/2021
Mohler
19-14062-31
Mason Industries
Mason Industries Tags: HWP's(Qty:3), CWP(Qty:4), AHU's(Qty:7) (2 Per Tag) SFDEJ Safeflex flexible rubber connector -Double Sphere -Peroxide cured, Kevlar Reinforced EPDM -250 psi, 215°F -Solid Steel “No Escape” retention rings Tags: AHU's(Qty:15) (2 Per Tag) SFU-DI -Single Sphere EPDM Connector -Threaded Ends
58
58
58
0
DELIVERED
07/16/2021
08/27/2021
08/30/2021
09/07/2021
09/07/2021
Mohler
19-14062-32
Nexus Valve
(4) HCS0625-11-1000 Bolts (8) HCS0625-11-150 Bolts (4) HCS0625-11-1200 Bolts
56
56
56
0
DELIVERED
07/14/2021
07/13/2021
07/16/2021
07/16/2021
LDAVIS
19-14062-33
Nexus Valve
VAV-115, VAV-116
Nexus Valve Tags: VAV-115, VAV-116 A2Y Coil Packs Includes automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. Union with PT port and manual air vent.
2
2
2
0
DELIVERED
08/27/2021
08/18/2021
08/24/2021
08/24/2021
Bruner
19-14062-34
Schebler Company
Lot AL-29-4C Double Wall Boiler Flue ONLY VALID WITH THE RIELLO BOILER PACKAGE DOES NOT INCLUDE COMBUSTION AIR INTAKE
1
1
1
0
DELIVERED
09/21/2021
09/17/2021
OLD DOMINION 10306374637
09/23/2021
09/23/2021
JOE
19-14062-35
Keller Supply
(2) 1.5" Pump Flanges Part #: 519604
2
0
0
0
DELIVERED
09/19/2021
08/13/2021
08/16/2021
08/16/2021
Mohler Keller shipped UPS
19-14062-36
Keller Supply
SMP-3, SMP-4
Grundfos Tags: SMP-3, SMP-4 Revised pumps, TPE3's 12 week lead time plus shipping.
2
2
2
0
DELIVERED
11/30/2021
01/16/2022
01/16/2022
OTHER keller shipped
01/16/2022
01/16/2022
keller shipped
19-14062-37
Mason Industries
Mason Industries (4) 2.5" - SFDEJ Flexes (2) 1.5" - SFU-DI Flexes
6
6
6
0
DELIVERED
09/03/2021
08/31/2021
09/08/2021
09/07/2021
MOHLER
19-14062-38
Nexus Valve
Nexus Valve Tags: AHU-002 CW Coils (Qty:2) NVFB Cast iron venturi circuit setter with memory stop, shut off, PT ports, and hang tag. Tags: AHU-002 HW Coils (Qty:2) XB Manual flow control valve with memory stop, shut off, PT ports, and hang tag.
4
4
4
0
DELIVERED
10/01/2021
10/01/2021
09/23/2021
09/28/2021
09/28/2021
LMULLER
19-14062-39
Supply House.com
(Qty:3) FP-22 Condensate Pumps 120V
3
3
3
0
DELIVERED
09/09/2021
09/09/2021
09/13/2021
09/13/2021
Mohler
19-14062-40
Schebler Company
4" Offset (23" Tall) (Qty:1) EVD-SPC1B-10R
1
1
1
0
DELIVERED
10/27/2021
10/26/2021
10/28/2021
10/28/2021
BRUNER
19-14062-41
Mason Industries
Mason Industries (Qty:1) MNSS 1x12
1
1
1
0
DELIVERED
12/17/2021
12/10/2021
12/16/2021
12/16/2021
MOHLER
19-14062-42
Nexus Valve
(Qty:4) - 6" Butterfly Valves RMA 3458 All 4 of the butterfly valves had cracks, will return to Nexus Valve for credit
4
4
4
0
DELIVERED
12/31/2021
12/31/2021
12/14/2021
12/20/2021
12/17/2021
PORTER
19-14062-43
Keller Supply
1.5" Threaded Flange Adapters #539605
2
2
2
0
DELIVERED
02/26/2022
01/28/2022
01/31/2022
01/31/2022
Keller shipped
19-14062-44
Sigma Products
Replacing (2) RCP-1's that GC Threw Away
2
2
2
0
DELIVERED
02/28/2022
02/28/2022
03/11/2022
03/11/2022
Signed By: Nik
19-14062-45
S. Conley Support
Labor to fix leaks on Hubbell Water Heaters
1
0
0
0
ORDERED
19-14062-46
S. Conley Support
Startup for Riello Boilers and Hubbell Water Heaters
1
0
0
0
ORDERED
19-14062-47
S. Conley Support
SO 22-61706 Boiler service work on 4/1 and 4/6 at MSO.
1
0
0
0
ORDERED
19-14062-48
Nexus Valve
40 gpm cartridge 50 gpm cartridge
2
2
2
0
DELIVERED
05/10/2022
05/06/2022
05/11/2022
05/10/2022
DMULLER
19-14062-49
MultiAqua, Inc.
(Qty:5) Wireless Remotes for MHWW's Part #: E-0004/EW11
5
5
5
0
DELIVERED
09/06/2022
09/06/2022
09/09/2022
09/09/2022
MOHLER
5% Surcharge
1
1
1
0
DELIVERED
09/06/2022
09/06/2022
09/09/2022
09/09/2022
MOHLER
19-14062-50
S. Conley Support
SO 22-61769 Service work on boilers to fix low gas pressure issues.
1
0
0
0
ORDERED
19-14062-51
Nexus Valve
25 GPM Cartridge
1
1
1
0
DELIVERED
10/13/2022
10/11/2022
10/14/2022
10/14/2022
JJOE
19-14062-52
S. Conley Support
SO 22-62040 Boiler Service Work at MSO
1
0
0
0
ORDERED
19-14062-53
RIELLO
10" Air Intake Motorized Dampers #20125632
6
6
6
0
DELIVERED
01/12/2023
01/12/2023
01/12/2023
01/20/2023
01/20/2023
MOHLER 10:28 A.M.
19-14062-54
S. Conley Support
SO 22-62229 Boiler Service Work on 12/23/2022
1
0
0
0
ORDERED
19-14062-55
S. Conley Support
SO 23-62273 Fan Coil Service Work on 1-16-2023
1
0
0
0
ORDERED
19-14062-56
S. Conley Support
SO 23-62328 Service work on 2-6-2023 to work on gas pressure high limit errors
1
0
0
0
ORDERED
SO 23-62324 Service work on 1-31-23 and 2-2-23 to work on gas pressure alarms
1
0
0
0
ORDERED
SO 23-62323 Service work and parts to wire combustion air dampers on 6 boilers
1
0
0
0
ORDERED
19-14062-57
MultiAqua, Inc.
(Qty:1) Air Filter Part #: P183-1 (FOR MHWW-24)
1
1
1
0
DELIVERED
02/23/2023
02/23/2023
03/02/2023
03/01/2023
PORTER
3% Freight Surcharge
1
0
0
0
DELIVERED
19-14062-58
S. Conley Support
SO 23-62309 Service work for thaw condensate traps and service high pressure gas conditions on 12/22/2022
1
0
0
0
ORDERED
19-14062-59
Nexus Valve
(Qty:1) 3/4" MBNL
1
1
1
0
DELIVERED
03/23/2023
03/23/2023
03/29/2023
03/29/2023
MOHLER
19-14062-60
S. Conley Support
SO 23-62481 Replace boiler controller button mat on 3/28/2023
1
0
0
0
ORDERED
19-14062-61
S. Conley Support
SO 23-62229 Service work on WH-2 to check hot water recirc pump that not working.
1
0
0
0
ORDERED
19-14062-62
S. Conley Support
SO 23-62504 Service work on B-1 module 4 on 5/9/2023
1
0
0
0
ORDERED
19-14062-63
MultiAqua, Inc.
Part #: P183-1 FOR MHWW-24-H-3
4
4
0
0
DELIVERED
06/16/2023
06/16/2023
06/23/2023
06/23/2023
Bruner 1059am
3% Freight Surcharge
1
0
0
0
DELIVERED
19-14062-64
MultiAqua, Inc.
(Qty:10) 24 VAC ADAPTER BOARD 115 VAC Part #: PCB-U-HW-B 115VAC For MHWW-24-H-3 Fan Coils
10
10
10
0
DELIVERED
08/11/2023
08/11/2023
08/15/2023
08/15/2023
KKENNEDY 1140am
3% Surcharge
1
0
0
0
DELIVERED
Freight
1
0
0
0
DELIVERED
19-14062-65
MultiAqua, Inc.
Replacement 24 Vac Adapter Board 115 VAC (Warranty)
1
1
0
0
DELIVERED
10/25/2023
10/24/2023
10/31/2023
10/31/2023