Job PO # | Brewery | SCS Job # | J-19-24568 |
Contractor | Intermountain Heating and AC | ||
Sales Engineeer | Sean Mattick | 406-585-7333, Ext 3011 | Project Admin | Liz Pullman | 406-551-7221 |
Updated | 11/19/2020 1:12 am |
Release | Shipping | Delivery | Freight Claims | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SCS PO# | MANUFACTURER | TAG | DESCRIPTION | # ORDERED | # DELIVERED | # B/O | STATUS | RELEASE | ORDERED | LEAD | NOTES | ESTIMATED | ACTUAL | TRACKING | NOTES | ESTIMATED | ACTUAL | SIGNED | NOTES | ISSUES | CLAIM # | NOTES |
PO-19-24568-01 | West Coast - Omniduct | Lot Low Pressure Single Wall Galvanized Spiral Pipe and Fittings with Couplers Every 10'
Appox: 1,387# | 1 | 1 | 0 | DELIVERED | 01/07/2020 | 01/07/2020 | 3-5 days | 01/09/2020 | 01/13/2020 | OldDominion 7781311504 | 01/19/2020 | 01/19/2020 | NA | |||||||
PO-19-24568-02 | Nailor Industries | Manual Operated Volume Dampers w/ Hand Locking Quadrants and 2" Standoffs | 22 | 22 | 0 | DELIVERED | 01/07/2020 | 01/07/2020 | 2-3 weeks | 01/31/2020 | 01/16/2020 | FedEx 130844666441 | 01/23/2020 | 01/23/2020 | NA | |||||||
PO-19-24568-03 | Tempered Air Group | Gas Fired Unit Heater
- Thermostat
TAG: GUH1-1
* AL-29-4C Venting and Gas Lines By Others | 1 | 1 | 0 | DELIVERED | 01/22/2020 | 01/22/2020 | 1-2 weeks | 01/28/2020 | 01/28/2020 | best way NA | 02/12/2020 | 02/12/2020 | NA | |||||||
PO-19-24568-04 | Crescent Electric | Heavy Duty Architectural Electric Fan Forced Wall Heaters
-Integral Thermostat
TAG: EWH1-1,1-2,1-3,2-1,2-2 | 5 | 5 | 0 | DELIVERED | 01/22/2020 | 01/22/2020 | 4-5 weeks | 02/18/2020 | 02/18/2020 | 02/21/2020 | 02/21/2020 | Myers | ||||||||
PO-19-24568-05 | Thermal Supply | Duct Mounted Fan Coil and Matching Outdoor Unit
- Filter Cabinet
- 50' Lineset
TAGS: FCU2-1, CU2-3 | 1 | 1 | 0 | DELIVERED | 01/22/2020 | 01/22/2020 | 1-2 weeks | 01/27/2020 | 01/27/2020 | NorthPark Transportation NA | 02/05/2020 | 02/05/2020 | NA | |||||||
PO-19-24568-06 | ACME Manufacturing | (7) Ceiling Mounted Exhaust Fans
- Vibration Isolators
- Speed Control
- Backdraft Dampers
- Wall Caps
TAGS: EF1-1,1-2,1-4,1-5,2-1,2-2,2-3
(1) Sidewall Upblast Exhaust Fan
- Explosion Proof Motor
- Explosion Proof Disconnect
TAG: EF1-3 | 8 | 8 | 0 | DELIVERED | 01/22/2020 | 01/22/2020 | 6-8 weeks | 04/17/2020 | 04/17/2020 | YRC 8587033337 | 04/21/2020 | 04/21/2020 | Jordan | |||||||
PO-19-24568-07 | Nailor Industries | Grilles, Registers and Diffusers | 64 | 64 | 0 | DELIVERED | 02/05/2020 | 02/05/2020 | 2-3 weeks | 03/13/2020 | 03/16/2020 | ABF 075066276 | 03/25/2020 | 03/25/2020 | NA | |||||||
Electric Duct Heater
- Air Proving Switch
- SCR Control
- Disconnect
TAG: EDH2-1 | 1 | 1 | 0 | DELIVERED | 02/05/2020 | 02/05/2020 | 2-3 weeks | 03/13/2020 | 03/16/2020 | ABF 075066276 | 03/25/2020 | 03/25/2020 | NA | |||||||||
PO-19-24568-08 | S. Conley Sales | Heavy Duty Commercial Ceiling Fans
- Down Rod
- Speed Control
- Fan Guard
TAGS: CF1-1,1-2,1-3,2-1,2-2 | 5 | 5 | 0 | DELIVERED | 02/05/2020 | 02/05/2020 | 4-5 weeks | 03/02/2020 | 02/24/2020 | ABF 044134326 | 03/05/2020 | 03/05/2020 | NA | |||||||
PO-19-24568-09 | Nailor Industries | Low Leakage Opposed Blade Control Dampers
* Actuators and Controls By T.C. | 8 | 8 | 0 | DELIVERED | 02/14/2020 | 02/14/2020 | 4-5 weeks | 03/13/2020 | 03/20/2020 | XPO 435-162851 | 03/24/2020 | 03/25/2020 | Dan M | |||||||
Aluminum Stationary 4" Deep Drainable Blade Louvers
- Channel Frame
- Standard Color To Be Selected By Architect
TAGS: L1-1,1-2,2-1,2-2,2-3,2-4 | 6 | 6 | 0 | DELIVERED | 02/14/2020 | 02/14/2020 | 4-5 weeks | 03/13/2020 | 03/20/2020 | XPO 435-162851 | 03/24/2020 | 03/25/2020 | Dan M | |||||||||
PO-19-24568-10 | Keller Supply | 15' of 14" Type B-Vent
(1) 14" B-Vent 90° Elbow
(1) 14/14/14 B-Vent Tee
(1) 14" Spun Plug/ T Cap
(1) 14" B-Vent Rain Cap | 1 | 1 | 0 | DELIVERED | 03/10/2020 | 03/10/2020 | 2-3 weeks | 03/20/2020 | 03/20/2020 | OTHER NA - MT Cartage | 03/29/2020 | 03/29/2020 | NA | |||||||
PO-19-24568-11 | Nailor Industries | 1 | 1 | 0 | DELIVERED | 06/23/2020 | 06/23/2020 | 5-6 weeks | 07/31/2020 | 07/27/2020 | FED-EX 165153568419 | 07/30/2020 | 07/30/2020 | TMeyers | ||||||||
7 | 7 | 0 | DELIVERED | 06/23/2020 | 06/23/2020 | 5-6 weeks | 07/13/2020 | 07/13/2020 | 07/16/2020 | 07/16/2020 | Myers |