SCS PO#MANUFACTURERTAGDESCRIPTION# ORDERED# DELIVERED# B/OSTATUSRELEASEORDEREDLEADNOTESESTIMATEDACTUALTRACKINGNOTESESTIMATEDACTUALSIGNEDNOTESISSUESCLAIM #NOTES
PO-20-1525-01
Flexmaster
Lot Low Pressure R6.0 Insulated Flex Duct
1
1
0
DELIVERED
03/26/2020
03/26/2020
5-10 days
04/03/2020
04/02/2020
OTHER NA
04/09/2020
04/09/2020
High efficiency take-offs with Damper and Hand Lock Quadrant Downstream of VAVs. No Damper upstream of VAVs
21
21
0
DELIVERED
03/26/2020
03/26/2020
5-10 days
04/03/2020
04/02/2020
OTHER NA
04/09/2020
04/09/2020
PO-20-1525-02
Nailor Industries
Single Duct VAV Boxes with Standard Fiberglass Liner, hanger brackets and access door. CONTROLS SUPPLIED AND MOUNTED BY OTHERS
9
9
0
DELIVERED
03/26/2020
03/26/2020
3-4 weeks
04/24/2020
04/24/2020
OLD DOMINION 10423699197
05/04/2020
05/04/2020
Steve
Manual Volume Dampers with locking Quadrant and 2" Stand-off
12
12
0
DELIVERED
03/26/2020
03/26/2020
3-4 weeks
04/24/2020
04/24/2020
OLD DOMINION 10423699197
05/04/2020
05/04/2020
Steve
Grilles, Registers and Diffusers
11
11
0
DELIVERED
03/26/2020
03/26/2020
3-4 weeks
04/24/2020
04/24/2020
OLD DOMINION 10423699197
05/04/2020
05/04/2020
Steve