St James 4th Floor South Wing Admin

Job PO #224277SCS Job #J-18-1621
ContractorTri County Mechanical & Electric - Butte
Sales EngineeerGary Wambeke406-451-7232
Project Admin
Updated09/28/2020 1:26 am
ReleaseShippingDeliveryFreight Claims
SCS PO#MANUFACTURERTAGDESCRIPTION# ORDERED# DELIVERED# B/OSTATUSRELEASEORDEREDLEADNOTESESTIMATEDACTUALTRACKINGNOTESESTIMATEDACTUALSIGNEDNOTESISSUESCLAIM #NOTES
PO-18-1621-01
Mason Industries
For HVAC Dry Side Scope of work; 1 Lot of Mason Industries Seismic Isolation PER IBC 2012 and Specifications (Seismic Design Category = D, Ip = 1.0)as follows: 1) HVAC Dry Side Seismic Isolation including ductwork 6 square feet area and larger and hanging equipment (including VAV’s): 7 Hanger Locations which include 4 seismic cables per location, 2) Attachment and equipment overturn calculations that will provide engineered anchoring details per local seismic requirements: 0 separate calculations required for equipment attachments 3) As Required Engineered and PE Stamped shop drawings: 4) Vibration Isolation Pads and Spring Hangers for equipment and ductwork: ZERO Spring Hangers or Pads 5) Quality control documentation and site verification. ****Nuts, bolts, washers, guides, rods, strut, steel angle, embeds and anchor bolts, AND ROD STIFFENERS, AND VIBRATION ISOLATION (other than what has specifically delineated above), AS WELL AS EXISTING PIPE/DUCT/EQUIPMENT by others.
1
1
0
DELIVERED
12/04/2019
12/04/2019
3-4 weeks
12/20/2019
12/16/2019
01/01/2020
01/01/2020
PO-18-1621-02
Flexmaster
Lot Low Pressure R6.0 Insulated Flex Duct
1
1
0
DELIVERED
12/03/2019
12/03/2019
5-10 business days
12/12/2019
12/11/2019
12/18/2019
12/18/2019
T. Carpenter
High efficiency Take-Offs with Dampers and 2" Stand-off
10
10
0
DELIVERED
12/03/2019
12/03/2019
2-3 weeks
12/12/2019
12/11/2019
12/18/2019
12/18/2019
T Carpenter
PO-18-1621-03
Nailor Industries
Grilles, Registers and Diffusers
31
31
0
DELIVERED
12/04/2019
12/04/2019
4-5 weeks
01/03/2020
01/03/2020
01/09/2020
01/09/2020
PBoerrmann
2 boxes DAMAGED
Nailor resent entire order - how to handle?
Single Duct VAV Boxes with HW Coil, Hanger Brackets, Access Dor, Fiber Free Liner. CONTROLS SUPPLIED AND MOUNTED BY OTHERS
7
7
0
DELIVERED
12/04/2019
12/04/2019
4-5 weeks
01/03/2020
01/03/2020
01/09/2020
01/09/2020
PBoerrmann
2 boxes DAMAGED
Nailor resent entire order - how to handle?
Manual Volume Dampers with locking quadrant and 2" Stand-off
20
20
0
DELIVERED
12/04/2019
12/04/2019
4-5 weeks
01/03/2020
01/03/2020
01/09/2020
01/09/2020
PBoerrmann
2 boxes DAMAGED
Nailor resent entire order - how to handle?
PO-18-1621-04
Lewis & Lambert
Lot medium and low pressure, single wall galvanized spiral pipe and fittings with couplers every 10 feet Round Only - Approximately 1002#
1
1
0
DELIVERED
12/09/2019
12/09/2019
2-3 weeks
12/16/2019
12/31/2019
Na NA
12/10/2019
12/10/2019
PO-18-1621-05
Nailor Industries
Extruded Aluminum Channel Frame Louvers with Custom Color to be selected by Architect
2
2
0
DELIVERED
12/10/2019
12/10/2019
4-5 weeks
01/17/2020
12/23/2019
01/03/2020
01/03/2020
Tyler Leary