Job PO # | 10096/W-00001 | SCS Job # | J-19-14030 |
Sales Engineeer | Eric Palmer | 406-451-7231 | Project Admin | Z - Liz Pullman | 406-551-7221 |
Updated | 12/19/2022 12:29 pm |
PO | Shipping | Delivery | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SCS PO# | MANUFACTURER | TAG | DESCRIPTION | ORD | SHIP | DELV | B/O | STATUS | ORIGINAL ESTIMATED SHIP DATE | REVISED ESTIMATED SHIP DATE | ACTUAL SHIP DATE | TRACKING | NOTES | ESTIMATED DELIVERY DATE | ACTUAL DELIVERY DATE | SIGNED | NOTES |
19-14030-01 | Sigma Products | CUH-S103 | SFF04 Semi Recessed Wall Mounted Cabinet Unit Heater
| 1 | 5 | 5 | 0 | DELIVERED | 07/03/2020 | 07/13/2020 | UPS FREIGHT 485490784 | 07/23/2020 | 07/22/2020 | Tim | |||
CUH-S109 | SFF03 Fully Recessed Ceiling Mounted Cabinet Unit Heater | 1 | 0 | 0 | 0 | DELIVERED | |||||||||||
CUH-S108, CUH-S401 | SFF02 Semi Recessed Wall Mounted Cabinet Unit Heater | 2 | 0 | 0 | 0 | DELIVERED | |||||||||||
UH-S111 | 015H Horizontal Unit Heater | 0 | 0 | 0 | 0 | DELIVERED | |||||||||||
19-14030-02 | RIELLO | Array AR3000 Condensing Boiler | 2 | 2 | 2 | 0 | DELIVERED | 06/08/2020 | 06/16/2020 | OTHER NA | 06/24/2020 | 06/24/2020 | |||||
BACnet Gateway (RS485)
| 1 | 1 | 1 | 0 | DELIVERED | ||||||||||||
BKI-3000 Condensate Neutralizer Kit
| 2 | 2 | 2 | 0 | DELIVERED | ||||||||||||
Freight to Zip Code 59718 | 1 | 1 | 1 | 0 | DELIVERED | ||||||||||||
19-14030-03 | Armstrong Pumps | ET-1 | 85-L Expansion Tank | 1 | 1 | 1 | 0 | DELIVERED | |||||||||
AS-1 | VAS Tangential Air Separator with Strainer | 1 | 1 | 1 | 0 | DELIVERED | 05/29/2020 | 05/22/2020 | 05/22/2020 | 05/29/2020 | 05/28/2020 | FINUCANI | |||||
HWP-1, HWP-2 | Series 4280 Close Coupled End Suction Pumps | 2 | 0 | 0 | 0 | ORDERED | |||||||||||
19-14030-04 | Mason Industries | Lot of Mason Industries Seismic Isolation | 1 | 1 | 1 | 0 | DELIVERED | 09/25/2020 | 09/24/2020 | 09/30/2020 | 09/30/2020 | office | |||||
19-14030-05 | Nexus Valve | Nexus Valve
Tags: VAV's(Qty:14), RTU-1
A2Y Coil Packs
Includes automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports. Union with PT port and manual air vent.
Tags: CUH's(Qty:4), UH-S111
UM
Includes automatic flow valve with shut off, PT ports, and hang tag.
Tags: HWR Piping(Qty:5), HWS Piping(Qty:5)
XB
Manual flow control valve with memory stop, shut off, PT ports, and hang tag.
Tag: RTU-2
A2FY Coil Packs
Includes cast iron automatic flow valve with shut off, PT ports, and hang tag. Y-strainer with blowdown valve, shut off, and PT ports.
Tag: RTU-2
NVFB
Cast iron venturi circuit setter with memory stop, shut off, PT ports, and hang tag.
Tag: HWR Piping (Mech Room)
SXFV
Cast Iron Y-strainer with blowdown valve, shut off, and PT ports | 23 | 23 | 23 | 0 | DELIVERED | 09/18/2020 | 09/14/2020 | YRC 349-182045-5 | 09/28/2020 | 09/28/2020 | Tim | ||||
19-14030-06 | Keller Supply | Tag: BV-1
MBNL
Includes Lead Free MB globe style circuit setter with memory stop, PT ports, and hang tag.
Tags: BV-2(Qty:2)
Lead Free circuit setter with memory stop, PT ports, and hang tag. | 3 | 3 | 3 | 0 | SHIPPED | 09/02/2020 | 09/02/2020 | 09/01/2020 | 09/04/2020 | 09/04/2020 | NA | ||||
19-14030-07 | Mason Industries | Lot of Seismic Restraints and Overturn Calculations | 1 | 1 | 1 | 0 | DELIVERED | 10/02/2020 | 09/25/2020 | ESTES 1760374173 | 10/05/2020 | 10/05/2020 | Tim | ||||
19-14030-08 | Mason Industries | HWP-1, HWP-2 (2 PER TAG) | SFDEJ Safeflex flexible rubber connector | 4 | 4 | 4 | 0 | DELIVERED | 09/18/2020 | 09/15/2020 | 09/21/2020 | 09/21/2020 | Office | ||||
19-14030-09 | Mason Industries | Super WMH 2x2 Neoprene Pads | 8 | 8 | 8 | 0 | DELIVERED | 11/06/2020 | 10/28/2020 | 11/02/2020 | 11/02/2020 | office | |||||
19-14030-10 | Mason Industries | FFL-6" x 12 | 2 | 2 | 2 | 0 | DELIVERED | 10/23/2020 | 10/27/2020 | 11/03/2020 | 11/02/2020 | office | |||||
19-14030-11 | Twin City Hose | 3/4" x 7" Bronze Braided Flex Hoses with Sweat Connections
TCHB-075-FFSC | 2 | 2 | 2 | 0 | DELIVERED | 11/26/2020 | 11/25/2020 | 11/30/2020 | 11/30/2020 | Office | |||||
19-14030-12 | BKI Industries | BKI-3000 Condensate Neutralizer Kits | 2 | 0 | 0 | 0 | DELIVERED | 01/05/2021 | 01/05/2021 | 01/07/2021 | 01/07/2021 | office | |||||
19-14030-13 | S. Conley Support | Startup for Boilers #1 and #2 at West Bozeman Health on 2/15 | 1 | 0 | 0 | 0 | ORDERED |